See SeqMaster in Action
Explore the interface through real screenshots of the application
Tip: View on desktop for best experience
Dashboard Overview
SeqMaster - Dashboard
SeqMaster
localhost:8000
Dashboard
Today
47
Tests run
96%
Pass rate
Today
2
45 passed
Gns.
12s
1,247 totalt
Tester Status
OnlineSeqMaster
TST-RP5-001
Version
1.0.0
Uptime
2d 14h
CAN
PSU
Barcode
Relays
Seneste Tests
PASS
PCB-2024-0847
12s • 10:42
PASS
PCB-2024-0846
11s • 10:38
FAIL
PCB-2024-0845
8s • 10:35
PASS
PCB-2024-0844
14s • 10:31
Real-time dashboard showing test statistics, tester status, and recent results
Operator View - Running Test
SeqMaster - Operator
PCB Functional Test
DUT: PCB-2024-0848
RUNNING
Progress
Step 5 of 8
Measure 3.3V Rail
Reading voltage...
Initialize Hardware
Setup complete
Power On DUT
12V @ 0.45A
Measure VCC
5.02V (4.8-5.2V)
CAN Bus Communication
Response: OK
Elapsed Time
00:08
Operator view showing real-time test execution with step progress
Sequences Management
SeqMaster - Sequences
Test Sequences
| Name | Version | Steps | Status | Actions |
|---|---|---|---|---|
|
PCB Functional Test
SEQ-PCB-001
|
1.2.0 | 24 | Active |
|
|
Power Supply Check
SEQ-PSU-001
|
2.0.1 | 18 | Active |
|
|
Final Assembly Test
SEQ-FINAL-001
|
1.0.0 | 42 | Draft |
|
Sequence management with upload, edit, and version control
Test Results & Analysis
SeqMaster - Results
Yield Trend (7 Days)
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Top Failure Modes
VCC Out of Range
42%
CAN Timeout
28%
Firmware Flash Failed
18%
LED Verification
12%
8,472
Total Tests
93.7%
Overall Yield
4.8s
Avg Test Time
534
Failed Units
Comprehensive analytics with yield tracking, failure analysis, and trend visualization
Ready to Try SeqMaster?
Download the free demo and see it in action on your own hardware.